Create a custom metric using date fields
I would like to be able to create KPI's based on a couple of the date fields we are bringing in and in order to do that I need to be able to create a custom metric for the date fields. For example. we put in an anticipate date our customer wants something complete and then we add the date that it was actually completed. I would like to be able to understand the difference between the two.
-
This is becoming more important for us for tracking time to first value. We're doing some hacky things by tracking this via a lifecycle phase, but we're finding it's not as precise as we need (did someone correctly move the customer to the right lifecycle when it actually happened, or was it a week later, or did they move it accidently too soon, etc).
Having the ability to base KPIs on two date-based attributes would be great. This would also solve some of the clunkiness w/ the Days in Lifecycle phases (due to the above, or someone accidently moving to a closure stage and reseting the clock). Would help drive precision here!
Please sign in to leave a comment.
Comments
2 comments